|
THE
LIST OF PROJECTS CALLING FOR FOREIGN DIRECT INVESTMENT
2001
AND AFTERWARDS
CHEMISTRY &
FERTILIZER
|
PROJECT NAME
|
LOCATION
|
SPECIFICATION
|
|
PS
Production
|
Ba
ria - Vung tau
|
30000
tones/year
|
|
Produce
DAP fertilizer
|
|
330000
tones/year
|
|
Produce
ethylen and PE
|
Ba
Ria – Vung Tau
|
300.000
tones/year (using Etan gas from gas processing plant of Southern Con
Son basin ( mainly from Hai Thach field)
|
|
Produce
phosphorus
|
Lao
Cai
|
30.000
tones/year
|
|
Produce
welding sticks
|
Ha
Tay
|
20.000
tones/year
|
|
Produce
phosphorous acid
|
Lao
Cai
|
450.000
tones/year
|
|
Soda
plant
|
The
Central area
|
200.000
tones/year
|
|
Produce
plastic components and parts for cars
|
Dong
Nai
|
1000
tones/year
|
|
Produce
synthetic rubber
|
The
Central area
|
90.000
tones /year
|
|
LAB
production plant
|
Hai
phong, Quang ngai
|
|
|
Produce
carbon soot
|
The
Central and the North areas
|
30.000
tones/year
|
back
to top
CONSTRUCTION MATERIALS
|
PROJECT NAME
|
LOCATION
|
SPECIFICATION
|
|
a. Cement
|
|
|
|
Special
and white cement plant
|
Quang
Ninh
|
|
|
b. Other materials
|
|
|
|
Mineral
cotton fibre plant
|
Dong
Nai
|
5000
ton/year
|
|
Manufacturing
plant of durable alkali glass fibre for metal making sheets
|
Quang
Nam, Da Nang, Ba Ria
|
10.000
ton/year
|
|
Palnt
of decoration materials
|
Ba
ria - Vung tau
|
|
back
to top
ELECTRIC
& ELECTRONIC EQUIPMENTS
|
PROJECT NAME
|
LOCATION
|
SPECIFICATION
|
|
Manufacture
high - quality ceramic insulators
|
Hai
Duong
|
upper
110KV
|
|
Manufacture
medical electronic equipments
|
Hanoi,
HCMC
|
|
|
Magnetic
materials and products manufacturing plants
|
Ha
Noi, HCMC, Dong Nai
|
10.000.000
unit/year
|
|
Manufacture
of sensors, PLC and synchronized group equipment for automatic
measurement and control
|
Hanoi,
HCMC, Dong Nai
|
|
|
Compact
discs manufacturing plants
|
|
|
|
Manufacture
tubes and computers screens
|
|
12.000
unit/year
|
|
Manufacture
components and group of components for computers, assembling
peripheral devices
|
|
10.000
unit/year
|
|
Manufacture
centralized air conditions system
|
Ha
Noi , HCMC, Dong Nai
|
|
back
to top
GARMENT-TEXTILE
|
PROJECT NAME
|
LOCATION
|
SPECIFICATION
|
|
Plant
of textile and dye processing
|
Provinces
in the Central ,
Hanoi,
|
1200-1600
Silk T/year
10-13
mill Silk m/year
|
|
Plant
of garment materials
|
Haiphong,
Hai duong
|
|
|
Plants
of garments and plants of shoes making for export
|
|
|
back
to top
MECHANIC
|
PROJECT
NAME
|
LOCATION
|
SPECIFICATION
|
|
Cars’
and motorcycles’ appurtenances manufacturing plants
|
Ha
Noi, Quang Ninh
|
1000
T/year
|
|
Manufacturing
plant of equipment and appurtenances for construction materials
machine
|
Hai
Phong-Dong Nai
|
|
|
Assembling
plant of equipment and machines for construction process
|
Ha
Noi or Quang Nam, Da Nang
|
cars7vihicles
250 unit/year; machines for construction 370 unit
|
|
Manufacture
electric transformer
|
Hai
Phong, Quang Ninh
|
upper
110 KV
|
|
Large
size mechanical manufacturing
|
Hai
Phong
|
|
|
Ship/vessel
building and repairing
|
Hai
Phong, Quang Ninh,
|
upper
10000 DWT
|
|
Manufacture
standard screws
|
Hanoi,
HCM city, Dong Nai
|
|
|
Manufacture
bearings
|
Da
Nang, Hai Phong
|
|
|
Manufacture
digital programed tools equipments, digital equipments
|
Dong
Nai, Hanoi
|
500
– 1000 equipments/year
|
|
Manufacture
tractors
|
Hai
Phong, Vung Tau
|
upper
50 HP
|
back
to top
MINERALS MINING
|
PROJECT NAME
|
LOCATION
|
|
Bauxite
exploitation, aluminum production
|
Lam
Dong, Dak Lak
|
back
to top
OIL AND GAS
|
PROJECT
NAME
|
LOCATION
|
SPECIFICATION
|
NOTE
|
|
New exploration and exploitation
|
 | Gulf
of Tonskin: |
 | Block
104, 107 |
 | Block
110, 113, 114 |
 | The
Central area |
 | Block
115, 122 |
 | Block
135, 136 |
 | The
Southern ConSon area |
 | Block
04.1; 04.2; 05.1B; 10; 11.1; from 18; to 24 |
 | The
South-West |
from Block 41 to 45
|
|
PSC/JV
|
|
Gas pipelines
|
West-South on-shore (from PM-3-CAA to Mekong delta)
|
Gas pipelines with
- 289 km off-shore and 43 km on-shore longs.
- 1.5 billion m3/year designed output and 3 billion
m3/year maximum output.
|
JV
|
|
Plant No.2 for oil refinery and petro-chemical.
|
|
6 million tones/year
|
JV-BOT
|
back
to top
PHARMACY INDUSTRY
|
PROJECT NAME
|
LOCATION
|
SPECIFICATION
|
|
Improvement
and upgrading production line for traditional medicine and herbs
|
Hai
Phong
|
|
|
Improvement
and upgrading production line of traditional medicine and herbs
|
HCMC
|
600
tones/year
|
|
Surgical
spitch production plant
|
Ha
Noi
|
5
million m catgut/year
|
|
Produce
disposal medical rubber instrument single use
|
The
Northern of Ha Noi
|
1
million catheters, 20 million pairs of gloves
|
|
Plant
of pharmacy getting GMP standard
|
Hanoi
|
Producing
injection ampoule, intravenous infusion bottle, antibiotic capsules
and tablets, various types of pills, oilments and creams, aerosol
and spray
|
|
Plant
of materials for producing vaccin medicine
|
Hanoi
|
500
material T/year
|
|
Producing
vaccine production by gene technology
|
|
|
|
Health
services facilities
|
Ha
noi
|
|
back
to top
STEEL
|
PROJECT NAME
|
LOCATION
|
SPECIFICATION
|
NOTE
|
|
Producing
billet
|
Quang
Ninh, Dong Nai, Hai phong, Baria-Vung tau
|
500.000
T/plant
|
|
|
Manufacturing
special steel product
|
Hai
Phong
|
50.000
tones/year
|
|
|
Complex
metallurgy
|
|
1,5
mill T/year
|
JV
|
back
to top
AGRICULTURE
|
PROJECT
NAME
|
LOCATION
|
SPECIFICATION
|
|
Planting
mulberry-tree and cotton, silk making,
|
Centre
area; Hai phong; Hai duong; Hung yen; Thanh hoa; Can tho | |